McElhanney Sample · not a real bid
Proposal sample for McElhanney · from Hired Hand

Your experts' notes in. Finished proposal pages out.

The work in your Proposals Specialist posting, done by Hired Hand on a made-up bid: three experts' rough notes turned into finished pages in your colours, checked against the RFP and proofread. Your team keeps the meetings and the sign-off.

The RFP, the county, the hamlet and the notes are all made up for this sample.

1 · The finished pages

Five pages from a sample bid, in your colours and fonts

What your Proposals Lead would review before submission. In real work they arrive as a print-ready PDF plus the editable file.

iTap any paragraph marked "From the notes" to see what the experts sent

Swipe for all 5 pages →

Cover · the first thing the County's review panel sees

Proposal to Example County

Hamlet of Example Creek Main Street Rehabilitation

Preliminary and Detailed Design
RFP EC-2026-14
November 2026
McElhanney

Page 2 · what the County needs, and why choose you (the win themes)

McElhanneyExample Creek Main Street · RFP EC-2026-14
Our understanding

A main street that works again, above and below ground

Example County wants Main Street rebuilt from the pipes up: new water and sewer lines, a street that drains in spring, and sidewalks that make the hamlet a place people stop. The design must be ready to tender in January 2028.

1st to 5th Avenueabout 600 m of Main Street
2nd and 3rd Avenueto the back lanes
Pipes, road, drainagewater main, sewers, storm, paving
Streetscapesidewalks, trees, rain gardens
1

One team from survey to tender

Surveyors, engineers, landscape architects and engagement planners in one firm, so the County has one point of contact and nothing is lost between disciplines.

2

Main Street stays open for business

Construction is planned one block at a time, so every business keeps water and a walkable route to its door.

3

A lasting fix for spring ponding

Engineers and landscape architects design the drainage together, so the fix at Main Street and 2nd Avenue also makes the corner safer to cross.

Key plan: Main Street from 1st to 5th Avenue, with 2nd and 3rd Avenue to the back lanes. The block from 4th to 5th Avenue was added by Addendum 2. Spring ponding is at Main Street and 2nd Avenue. Back lane 1st2nd3rd4th5th Ave Main St Addendum 2 Spring ponding at Main and 2nd
Key plan of the project limits (not to scale). Dashed: the block Addendum 2 added.
Sample proposal · made-up project2

Page 3 · how the work gets done, written from three experts' notes

McElhanneyExample Creek Main Street · RFP EC-2026-14
Our approach

Survey first, look underground, then design

New storm pipe, part of the drainage fix at Main and 2nd (stock photo)
From the notes ›

Start with an accurate picture of the street

Our surveyors will map Main Street from 1st to 5th Avenue, plus 2nd and 3rd Avenue back to the lanes, as soon as the snow is gone in April. GPS covers the open areas; a total station measures curbs, gutters and pipe elevations to the precision design needs. We'll also check the 1970s road widening plan early: the right-of-way may be narrower at the east end than the County's maps show, which affects how wide the new sidewalks can be.

From the notes ›

Look underground before we draw

Main Street's water main is cast iron from the 1950s and has broken repeatedly. Before design starts, we'll inspect the sanitary and storm sewers by camera in February and March, so the design is based on what's really in the ground, not on old drawings. The new water main and sanitary services run out to each property line.

From the notes ›

A lasting fix for spring ponding at Main and 2nd

Water ponds at Main Street and 2nd Avenue every spring: there are too few catch basins, and the grates plug with gravel. Our engineers and landscape architects will solve it together, with added catch basins and rain gardens built into curb extensions at the corner. The same curb extensions shorten the walk across the street and slow traffic through the hamlet.

Sample proposal · made-up project3

Page 4 · keeping businesses open, talking to the town, and the schedule

McElhanneyExample Creek Main Street · RFP EC-2026-14
Staging, engagement and schedule

Built one block at a time, with the town

Main Street from 1st to 5th Avenue in four construction phases, one block each, with a walkable route kept open on one side Phase 1Phase 2Phase 3 Phase 4 1st2nd3rd4th5th Ave Main Street, one block per phase
Light teal strip: the walkable route to every storefront, open in every phase.
From the notes ›

Every business stays open

We'll rebuild Main Street one block at a time. Temporary water lines keep every business supplied while its block's water main is replaced, and each storefront keeps a walkable route to its door.

From the notes ›

Designed with the people who use it

Business owners come first: they're the most affected by construction and parking changes, so we start with a walk along Main Street to meet them. An open house and an online survey follow, and what we hear shapes the preliminary design.

20272028 JFMAMJJASONDJ Kickoff with the County Sewer camera inspection Survey (after snowmelt) Business walk, open house, survey Preliminary design Detailed design Ready to tender
Sample proposal · made-up project4

Page 5 · who's on the team, plus a standard section from your library

McElhanneyExample Creek Main Street · RFP EC-2026-14
Project team

One point of contact, every discipline

One firm covers every discipline this project needs, so the County deals with one project manager from survey to tender.

Example CountyProject manager
Project ManagerProfessional engineer
Survey LeadAlberta Land Surveyor
Utilities and RoadsProfessional engineer
Landscape ArchitectureStreetscape and rain gardens
Engagement LeadBusiness walk and open house
Standard section · from your library

Quality management and safety

Your current approved wording drops in here unchanged, the same way in every bid. It's kept up to date in your content library (section 5 below).

Names and résumés: your team (Appendix A)5
2 · From notes to one voice

What your experts sent, and what went in the proposal

Experts write the way busy experts do: shorthand, trade terms, side notes. Here is each one's made-up note beside the finished paragraph, with every change listed.

3 · Checked against the RFP

Every requirement, and where it's answered

The County's review panel scores against this list, so the proposal is checked against it line by line, addenda included.

8 answered 1 caught and fixed 3 need your team
RFP sectionWhat it asks forWhere it's answeredStatus
Addendum 2Project now runs to 5th Avenue (was 4th)The survey lead's note still said "1st to 4th". Pages 2 and 3 now say 1st to 5th Avenue.Pages 2 and 3Caught, fixed
2.1Understanding of the project and the County's goalsPage 2Answered
2.2Method for survey, underground pipes, drainage and streetscapePage 3Answered
2.3Construction staging that keeps businesses openPage 4, with the staging diagramAnswered
2.4Engagement with business owners and residentsPage 4Answered
2.5Schedule with milestones, ready to tender by January 2028Page 4Answered
2.6Organization chart and key rolesPage 5Answered
2.7Quality management and safetyPage 5, your standard sectionFrom your library
3.1No prices in the technical proposal; fees go in a separate fileWhole document checkedAnswered
2.8Résumés of key staff, 2 pages each at mostYour team picks the people; we trim each résumé to 2 pages and match it to this bid.Appendix AYour team
2.9Three municipal references from the last 5 yearsPast projects and references always come from your records. We never write them.Appendix BYour team
Form AAddenda 1 and 2 acknowledged and signedFilled in; needs a signature from someone who can sign for McElhanney.Form AYour team
4 · Proofread

8 fixes before it goes out

Spelling, consistency and the numbers that have to agree from page to page. The first two are the kind that cost points.

CoverRFP EC-2026-41 → RFP EC-2026-14Digits swapped. Now matches the RFP and every page header.
Page 2construction-ready by fall 2027 → ready to tender in January 2028The intro promised a date the schedule on page 4 doesn't meet.
Pages 2 to 4Example Ck. → Example CreekThe hamlet's name, spelled out the same way everywhere.
Pages 3 and 4watermain → water mainTwo words, as the RFP writes it.
Page 32nd Ave., Second Avenue → 2nd AvenueOne style for street names.
Page 3the county → the CountyCapital C when it means Example County, as the RFP does.
Page 3Main St. → Main StreetSpelled out in full, as in the RFP title.
Page 3storm sewer's → storm sewersA plural, not a possessive.
5 · Saved for next time

3 new pieces for your content library

Your library of reusable proposal text and graphics is what makes the next bid faster. Each bid adds to it and keeps it current.

New · text

Main street rehabilitation: our approach

The survey, underground and drainage paragraphs from page 3, with the Example Creek details taken out so they fit the next main street bid.

Main streetsMunicipalApproach
New · diagram and text

Keeping businesses open during construction

The one-block-at-a-time staging diagram as an editable graphic, with the paragraph that goes with it.

StagingConstructionGraphic
New · text

Spring ponding: catch basins plus rain gardens

A short, plain explanation of the combined drainage fix, for any bid where flooding is a known problem.

DrainageLandscape architectureShort
How it would run

From RFP release to delivery: who does what

Your team keeps the meetings, the expert input and the sign-off. The writing, merging, layout and checking come to Hired Hand: Stephan, using AI tools and checking every page himself. All of it for one flat monthly fee, in place of one of your two new hires.

  1. RFP comes out

    Hired HandAI reads the RFP and every addendum into a requirements checklist; Stephan checks every line, then drafts the outline and win themes.

  2. Kickoff

    YouRun the kickoff meeting. Hired HandSend the checklist and win themes before the meeting, and a short list of questions for each expert.

  3. Notes come in

    YouExperts send notes however is easiest: an email, bullet points, a transcript of a voice memo.

  4. Writing and layout

    Hired HandAI drafts from the notes and your content library; Stephan edits every page into one voice and lays it out in your template.

  5. Review

    YouRun the review meeting and mark up the draft. Hired HandMake the changes and recheck against the RFP.

  6. Final

    Hired HandProofread, export the print-ready and digital files, update your library. YouPrint, sign and submit.

Where this paragraph came from